Toilet renovation: where to Begin

The bathroom is a room with unique states: high humidity, temperature differences. That is why making repairs in the restroom, you should clearly plan the whole operating process, to consider the sequence of measures to be performed. In the following guide, you will find out where to begin the repair in the restroom and what sorts of work ought to be performed with your own hands. Step-by-step instructions for toilet repair

Phase 1: drawing up a strategy and deciding on a layout solution.

Repair in the toilet can be of two types:

  • Unplanned, spontaneous, arising from the can of unforeseen circumstances. For instance, in the event of a pipe burst, flooding by neighbors.
  • vsyakuhnya.ru Planned, that can be either cosmetic or capital. It requires planning, serious fiscal investment and time.

Begin repairs in the bathroom is to determine the design, inside. Think through to the last detail, what will be the space, choose a color. Pastel colors are conventional, in addition to a blend of blue and blue, black or peach with beige.

Begin repairs in the toilet is to determine the design, interior design. Think in detail, what will be the room, pick a color. Pastel colours are deemed traditional, in addition to a blend of colours.

Next point is the selection of facing material. As a rule, finishing in the bathroom is performed with vinyl, porcelain tiles, mosaicand vinyl panels. Check the plumbing, if it has to be replaced. If needed, pick a suitable option. Proceed to the measuring function: quantify all sides, figure out the area of the area. Based on these information, we indicate the location of the plumbing fittings.

Step 2: the choice of sanitary fittings and material for finishing.

It is very important to realize that the purchase of sanitary ware precedes the preparation stage, rather than vice versa. This means that first we develop a new design project, make a plan, and then go to the shop. Another thing – you should specify the size of your favorite plumbing fittings and examine the plan, whether it matches.

It’s necessary to realize that the cost of plumbing fixtures is preceded by a preparation stage, rather than vice versa. This usually means that first we create a design project, create a plan, and then go to the store. Another one

As for materials for completing, it’s better to get them immediately for the whole repair cycle, so that then you will not be distracted if something was missing. Remember about preparing the essential tools.

Measure 3: dismantling plumbing and tiling.

After All of the preliminary work has been completed, proceed to the Start of the task process:

  • Eliminate the sink and bathtub from the room, even if they won’t be replaced with fresh ones. This manner, you may keep them intact and clean.
  • Remove the tile, cleaning following it all of surfaces: walls, ceiling, floor.
  • Remove old paint from the walls, if they were previously painted, since the adhesive solution or a fresh layer of paint will not adhere to the surface.

Measure 4: Cost of communications: plumbing, electric wiring.

Quite frequently in an older house, you ought to carefully inspect and replace not just the pipes which are in the toilet itself, but in addition the most important riser, and on occasion the interfloor plumbing. Why is it worth doing so? Old pipes at any time may give a leak, then the new fix will be spoiled, it is going to require additional investment to eliminate flaws.